Status of detailed route hearings

The Commission is currently conducting detailed route hearings to determine whether Trans Mountain's proposed route is the best possible route and whether its proposed methods and timing of construction are the most appropriate.

Status of detailed route hearings
Updated: August 11, 2021
Segment SOOs filed SOOs withdrawn prior to process decision SOOs requiring a process decision SOOs decided upon SOOs denied SOOs for which hearing processes were initially granted SOOs withdrawn after process decision SOOs with hearing processes that require a decision SOOs for which decisions have been released
Total Process type A: New hearings Process type B: Previous hearing resumed Process type C: Review previously issued decision
1. Greater Edmonton 1 1 0 n/a n/a n/a n/a n/a n/a n/a n/a n/a
2. Edmonton – Jasper 10 1 9 9 4 5 4 1 0 5 0 n/a
3. Hargreaves – Blue River 9 0 9 9 8 1 1 0 0 1 0 n/a
4. Blue River – Darfield 9 1 8 8 6 2 1 1 0 2 0 n/a
5. Black Pines – Wahleach 16 2 14 14 3 11 7 3 1 8 3 3
6. Fraser Valley – Langley 36 0 36 36 15 21 7 14 0 10 12 11
7. Surrey – Burnaby 19 1 18 18 16 2 2 0 0 2 0 n/a
Non-specific 2 0 2 2 2 0 0 0 0 0 0 n/a
Totals 96 6 90 90 50 40 20 19 1 25 15 14

Clarity for row totals: Certain SOOs cover multiple segments. The totals in this row remove duplication.

Contacts Us

Telephone (toll free): 1-800-899-1265
E-mail: TMX.ProcessHelp@cer-rec.gc.ca
Fax: 403-292-5503
Toll free fax: 1-877-288-8803

Media Inquiries

Media Relations Team
Canada Energy Regulator
Email: media@cer-rec.gc.ca
Telephone (toll free): 1-800-899-1265

Date modified: