Notice to Resume Work or of Measures Satisfied – Trans-Northern Pipeline Inc. – Order PRY-002-2023

Notice to Resume Work or of Measures Satisfied – Trans-Northern Pipeline Inc. – Order PRY-002-2023 [PDF 114 KB]

NOTICE TO RESUME WORK OR OF MEASURES SATISFIED IN THE MATTER OF THE CANADIAN ENERGY REGULATOR ACT, FOLLOWING AN ORDER UNDER SECTION 109(1)

The undersigned Canada Energy Regulator Inspection Officer hereby notifies Trans-Northern Pipeline Inc. that the hazardous or detrimental situation described in Order No. VAR-001-PRY –002-2023 has been fully remedied to the satisfaction of the Inspection Officer.

Therefore,

  •     suspended or stopped work may resume
  •  X the measures specified in the Order have been satisfied
Inspection Officer

Inspection Officer

19 June 2024

Information not available

Date

Name

Information not available

Information not available

IO Designation Number

Signature

210-517 10 Ave SW, Calgary AB  T2R 0A8

CVA number: CV2324-151

Date modified: