On Wednesday, Aug. 28, the National Energy Board (NEB) became the Canada Energy Regulator (CER). For further information please visit our Implementing the Canadian Energy Regulator Act information page

Administrative Monetary Penalty (AMP)

Reference
Number
Related
Documents
Last Updated
(yyyy-mm-dd)
Recipient Region/
Facility
DescriptionFootnote 1 Penalty
Amount
AMP-001-2019 2019-06-14 Plains Midstream Canada Regina, Saskatchewan Failure to locate a pipeline as prescribed by para. 6(1)(b) of the Damage Prevention Regulations – Obligations $76,000
AMP-002-2018   2018-07-10 Trans-Northern Pipelines Inc. Montreal Feeder System Contravention of a Board Order $28,000
AMP-001-2018   2018-06-25 Canadian Natural Resources Ltd. Ojay Pipeline Failure to comply with condition of a Board Order re: PCEMR submission $40,000
AMP-001-2017 2017-12-07 Landstar Projects Surrey (BC) 6(b) of the PCR, Part I for an unauthorized activity without written permission from the pipeline company prior to excavation $28,000
AMP-012-2015 2015-12-02 Conoco Phillips Canada Operations Ltd. Elmworth Station U to B Pipeline Integrity Project, Beavertail Creek (AB) 30(1) of the Act – Operation of a pipeline without a certificate and leave to open (Type B) $28,000
AMP-011-2015 2015-07-29 Melcor Developments Ltd. Rosenthal Blvd and 224 Street, Edmonton (AB) 112(1) of the Act – Construction of a facility or excavation without leave (Type B) $28,000
AMP-010-2015 2016-03-02 Enbridge Pipelines Inc. Line 4, Strome (AB) 4 of the OPR – Failure to ensure that a pipeline is designed, constructed, operated or abandoned as prescribed (Type B) $28,000
AMP-009-2015 2016-03-02 Westcoast Energy Inc. (Spectra Energy Transmission) Transmission North Expansion Project (BC) 2(3) of the AMP – Failure to comply with Condition 7 of Order XG-W102-005-2011 $4,000
AMP-008-2015 2015-04-17 Westcoast Energy Inc. (Spectra Energy Transmission) Pine River Gas Plant (BC) 49(1.1) of the PPR – Failure to notify as Prescribed (Type A) $6,300
AMP-007-2015 2016-02-12 Enbridge Pipelines Inc. Edmonton to Hardisty Pipeline Project (AB) Failure to comply with Condition 2 of Order XO-E101-006-2014 Rescinded
AMP-006-2015 2016-02-12 Enbridge Pipelines Inc. Plains Wascana Tank 80 (SK) Failure to comply with Condition 2 of Order XO-E101-021-2013 Rescinded
AMP-005-2015 2016-03-10 Enbridge Pipelines Inc. Line 3 replacement project construction site, Cromer (MB) 2(3) of the AMP – Failure to comply with Condition 3 of Order XO-E101-016-2013 $76,000
AMP-004-2015 2016-02-05 Enbridge Pipelines Inc. Replacement pipeline between the Cromer Terminal and the tie-in point within NW-9-926 WPM Failure to comply with Condition 2 of Order XO-E101-016-2013 Rescinded
AMP-003-2015 2015-02-12 Plains Midstream Canada ULC (Plains) Canada 53(1) and 55 of the OPR – Failure to conduct inspections and audits as prescribed (Type B) and Failure to document the audit as prescribed (Type B) $76,000
AMP-002-2015 2015-02-06 Enbridge Pipelines Inc. Edmonton to Hardisty Pipeline Project (AB) 2(3) of the AMP – Failure to comply with Condition 2 of Order XO-E101-006-2014 $16,000
AMP-001-2015 2015-01-22 Westcoast Energy Inc. (Spectra Energy Transmission) Dawson Creek Gas Plant (BC) 4(1) of the PPR – Failure to ensure that the company’s processing plant is designed, constructed, operated or abandoned as prescribed (Type B) $88,000
AMP-006-2014 [PDF] 2014-12-15 Lone Pine Resources Canada Ltd. Ojay Pipeline 2(3) of the AMP – Non-compliance with Condition 15 of Order XG-C357-09-2010 $28,000
AMP-005-2014 [PDF] 2014-09-08 Steve Minotakis (Dr Four Beat Energy Corporation) Meter station and piping between NW5-1-11W4 and SW-1-11WA near Aden (AB) 2(2) of the AMP – Non-compliance with Conditions 3 and 4 of Order SG-D081-01-2013 $25,000
AMP-004-2014 [PDF] 2014-12-11 Dr Four Beat Energy Corporation Meter station and piping between NW5-1-11W4 and SW-1-11WA near Aden (AB) 2(2) of the AMP – Non-compliance with Conditions 3 and 4 of Order SG-D081-01-2013 $100,000
AMP-003-2014 [PDF] 2014-07-02 Trans Mountain Pipeline ULC Nipisi Facility Piping at the Trans Mountain Edmonton Terminal (AB) 2(3) of the AMP – Non-compliance with Condition 2 of Order XO-T260-009-2013 $16,000
AMP-002-2014 2014-11-20 Canadian Natural Resources Ltd. Ladyfern Pipeline 25 of the OPR – Failure to perform pressure testing as prescribed (Type B) $28,000
AMP-001-2014 [PDF] 2014-05-23 Nova Gas Transmission Ltd. Musreau Lake West Receipt Meter Station (AB) 31(a) of the Act – Construction of a pipeline without a certificate (Type B) $16,000

 